Managed renewable power
Total managed power
Managed energy
Total energy generated
Renewable generated energy
Marketed energy
Volume of drinking water produced and distributed
Distributed volume of regenerated water
Volume of wastewater treated
El Resplandor, Cabrero, Chile
3MWp
Melo, Chile
2,07 MW
Las Lloysas, Coquimbo, Chile
3 MWp
Media
Ulisses Correia e Silva presides over the inauguration of the extension works of the Santa Maria WWTP. TCV Report
The Prime Minister of Cabo Verde, Ulisses Correia e Silva, presided over the inauguration of the extension works of the […]
New WWTP at Praia airport
CVTelecom’s Minuto Verde program talks about the new WWTP operated by APP at the Nelson Mandela International Airport, located in […]
El Ministro de Agricultura y Ambiente visitó las obras de ampliación de la EDAR de Santa MarÃa. Reportaje TCV
Gilberto Silva, Ministro de Agricultura y Ambiente de Cabo Verde, visitó la isla de la Sal para ver la evolución […]